Semua kategori

penyelesaian sistem solar industri

Laman utama > produk > penyelesaian sistem solar industri

Foshang Yingbang syarikat tekstil 600kw loji solar

  • gambaran keseluruhan
  • penyelidikan
  • produk berkaitan

Foshang YingBang textile company 600KW solar plant supplier

Perkhidmatan

Foshang YingBang textile company 600KW solar plant factory

Perkhidmatan

Foshang YingBang textile company 600KW solar plant manufacture

- Saya tak tahu.

Foshang YingBang textile company 600KW solar plant manufacture

- Saya tak tahu.

Foshang YingBang textile company 600KW solar plant details

- Saya tak tahu.

Foshang YingBang textile company 600KW solar plant details

- Saya tak tahu.

Pengeluaran tenaga elektrik 600 kilowatt pv (tahun pertama)
China - Foshan
bulan Sinaran matahari
gh kwh/m2
penjanaan kuasa elektrik
kwh
jan 82 39,360
Feb 68 32,640
Mar 73 35,040
apr 86 41,280
Mei 108 51,840
Jun 115 55,200
bulan Julai 138 66,240
peruntukan 131 62,880
Sep 123 59,040
Okt 122 58,560
Nov 97 46,560
dec 91 43,680
Perkhidmatan 1,234 592,320

- Saya tak tahu.

Foshang YingBang textile company 600KW solar plant details

- Saya tak tahu.

Foshan syarikat tekstil 600kwp stesen kuasa PV IRR
tahun pekali pemudaratan Penjanaan kuasa tahunan (10k kwh) nisbah penggunaan sendiri nisbah grid Harga penggunaan sendiri (cny/kwh)) harga grid
(cny/kwh)
manfaat penggunaan sendiri
(10k cny)
manfaat grid ((10k cny) kos insurans
(10k cny)
kos penyelenggaraan
(10k cny)
jumlah pendapatan
(10k cny)
Peringkat 1 2.00% 59.22 80% 20% 1.2 0.43 56.85 5.09 1.00 0.60 60.34
Ke-2 0.550% 58.04 80% 20% 1.2 0.43 55.71 4.99 1.00 0.60 59.11
Ke-3 0.550% 57.72 80% 20% 1.2 0.43 55.41 4.96 1.00 0.60 58.77
Keempat 0.550% 57.40 80% 20% 1.2 0.43 55.10 4.94 1.00 0.60 58.44
Kelima 0.550% 57.08 80% 20% 1.2 0.43 54.80 4.91 1.00 0.60 58.11
Ke-6 0.550% 56.77 80% 20% 1.2 0.43 54.50 4.88 1.00 0.60 57.78
Ke-7 0.550% 56.46 80% 20% 1.2 0.43 54.20 4.86 1.00 0.60 57.45
Ke-8 0.550% 56.15 80% 20% 1.2 0.43 53.90 4.83 1.00 0.60 57.13
9 0.550% 55.84 80% 20% 1.2 0.43 53.60 4.80 1.00 0.60 56.81
Ke-10 0.550% 55.53 80% 20% 1.2 0.43 53.31 4.78 1.00 0.60 56.49
11 0.550% 55.23 80% 20% 1.2 0.43 53.02 4.75 1.00 0.60 56.17
12 0.550% 54.92 80% 20% 1.2 0.43 52.72 4.72 1.00 0.60 55.85
13 0.550% 54.62 80% 20% 1.2 0.43 52.43 4.70 1.00 0.60 55.53
14th 0.550% 54.32 80% 20% 1.2 0.43 52.15 4.67 1.00 0.60 55.22
15 0.550% 54.02 80% 20% 1.2 0.43 51.86 4.65 1.00 0.60 54.91
16 0.550% 53.72 80% 20% 1.2 0.43 51.57 4.62 1.00 0.60 54.59
17 0.550% 53.43 80% 20% 1.2 0.43 51.29 4.59 1.00 0.60 54.29
18 0.550% 53.13 80% 20% 1.2 0.43 51.01 4.57 1.00 0.60 53.98
19 0.550% 52.84 80% 20% 1.2 0.43 50.73 4.54 1.00 0.60 53.67
Hari ke-20 0.550% 52.55 80% 20% 1.2 0.43 50.45 4.52 1.00 0.60 53.37
21 0.550% 52.26 80% 20% 1.2 0.43 50.17 4.49 1.00 0.60 53.07
22 0.550% 51.97 80% 20% 1.2 0.43 49.90 4.47 1.00 0.60 52.77
Hari ke-23 0.550% 51.69 80% 20% 1.2 0.43 49.62 4.45 1.00 0.60 52.47
Hari ke-24 0.550% 51.40 80% 20% 1.2 0.43 49.35 4.42 1.00 0.60 52.17
25 0.550% 51.12 80% 20% 1.2 0.43 49.08 4.40 1.00 0.60 51.87
Jumlah sampingan Perkhidmatan 1367.43 80% 20% Perkhidmatan 0.43 1312.73 117.60 25.00 15.00 1390.33
purata tahun Perkhidmatan 54.70 80% 20% Perkhidmatan 0.43 52.51 4.70 1.00 0.60 55.61

Hubungi saya

Email Address*
nama
nombor telefon
Nama syarikat
mesej*
Surat berita
Sila tinggalkan mesej kepada kami